ADEAM wall + ADEAM Unit Cap Construction Method, Construction example 2

Site place:
Shizuoka

No-entry fence is required during construction

The combination construction of ADEAM wall and ADEAM Unit Cap Construction was adopted because the concrete panel at the bottom of the retaining wall can suppresse the impact and the wall height 1.5 m from the road surface can secure the safety of the tea plantation located in side and no-entry fence would not be required. In addition, since the concrete panel is installed at a certain height, the drivers in the cars driving on the front road can have a good sight.

Site : Shizuoka Prefecture No. 2 Tomei Fuji IC Construction
• Wall height (m): 10.1
• Wall gradient : 1:0.3