Geo Rock Wall Dyke II type construction example 3
- Site place:
- Hiroshima
Considering the environment by using thinned wood in the prefecture
Hiroshima Prefecture Regional Disaster Prevention Countermeasures Comprehensive Mountain Restoration Project (Valley / Mountainside Construction) (No.20)
* Embankment height (m): 4.0 * Approximate construction extension (m): 20
* Rockfall diameter (m): D = 1.8 * Converted fall height (m): H = 11.6
* Rockfall energy (kJ): E = 920