Geo Rock Wall Dyke I type construction example 2
- Site place:
- Ehime
Ehime Prefecture Ohira construction area erosion prevention and drainage channel construction
* Height of embankment (m): 3.0 * Approximate construction extension (m): 42.6
* Slope height (m): H = 58 * Collapsed sediment impact force (kN / m): 54.25