ADEAM Wall (Two-step of inner work and outer work separated construction type) construction example 1

Site place:
Kanagawa

Two-step of inner work and outer work separated construction type for soft ground measures using lightweight filling material

Kanagawa Prefecture Yokohama Circular North Line
• Wall Height (m) : 5.0 • Wall gradient : Vertical  
• Approximate wall area (m²):1,400

 

Previous page

Related products / construction methods