Geo Rock Wall Dyke III type construction example 3

Site place:
Toyama

Protects the work road for Tateyama sand slide protection work and ensures safe work

The rockfall countermeasure work for sand slide protection orbit in Toyama Prefecture FY2012 Onigajo revetment work
* Embankment height (m): 3.0  * Approximate construction extension (m): 40
* Rockfall diameter (m): D = 1.0

Related products / construction methods