Geo Rock Wall Dyke III type construction example 3
- Site place:
- Toyama
![](https://eng.maedakosen.jp/wp/wp-content/uploads/GeoRockWall_dyke-III-seko3.jpg)
Protects the work road for Tateyama sand slide protection work and ensures safe work
The rockfall countermeasure work for sand slide protection orbit in Toyama Prefecture FY2012 Onigajo revetment work
* Embankment height (m): 3.0 * Approximate construction extension (m): 40
* Rockfall diameter (m): D = 1.0